Production Equipment

Workshop and Office

GNSEMS production building

GNSEMS production building

GNSEMS office building

GNSEMS office building

Located in Shenzhen, GNSems is a core facility of GNS Group, featuring advanced SMT lines and digital MES systems. This smart factory supports rapid PCBA prototyping and mass production with strict quality control and efficient supply chain integration.。

PCB Manufacturing Equipment

PCB process-browning line 2

PCB process-browning line

PCB process – sinking gold wire and gold-plated wire

Sinking gold wire and gold-plated wire

Our Shenzhen factory is equipped with fully automated production lines, including developing, etching, and plating equipment. These advanced machines ensure precision in every layer, supporting high-density and high-frequency PCB applications.
PCB process - sunken copper wire

Sunken copper wire

Etching is conducted in a controlled vacuum environment to ensure fine circuit structure and material integrity. This process is critical for complex PCB designs, such as those used in medical, aerospace, and industrial applications.

PCB Process-Brown Line

Brown Line

PCB process-browning line 2

Brown Line 2

PCB Process – Electroplating Line

PCB Process - Electroplating Line

PCB process – anime

PCB process - anime

PCB board warehouse

PCB board warehouse

PCB Process – Electrical Testing Workshop

PCB Process - Electrical Testing Workshop

From photoresist developing to automated copper plating lines, our equipment guarantees consistent performance and quality. Our ISO-certified production supports both prototype and mass production with full process traceability via MES.

PCB Assembly Equipment

Solder Paste Printing

Developing Line

Reflow oven

Shenzhen Headquarters

Solder paste printing machine and solder paste dispensing machine are easily confused concepts. The picture above shows a solder paste printing machine, which uses a printing scraper or printing roller to evenly press the solder paste on the surface of the circuit board with the pad position. The solder paste dispenser uses a dispensing needle or nozzle to control the flow and position of the solder paste to apply the solder paste to a specific area of the circuit board in a dispensing manner.

Wave Soldering Machine

Shenzhen Headquarters

Place Machine

Shenzhen Headquarters

X-Ray Inspection Machine

Shenzhen Headquarters

3D Solder Paste Inspection Machine

Shenzhen Headquarters

First Article Inspection Machine

Shenzhen Headquarters

AOl Machine

Shenzhen Headquarters

GNS is a one-stop PCBA service manufacturer, providing PCB/Components/PCBA total solution from prototype to mass production. Our multi-layers PCB factory offers fast delivery of high quality, with all processes made in-house. The supply chain is supported by a professional and experienced team, as well as a big data digital system, offer the most competitive price and stable delivery with original quality.

Get A Free Quote

Lorem ipsum or sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

SMT Manufacturer

Get A Free Quote

Submit your form to claim an industry-defining PDF—the gift surprise awaits on the final page!

SMT Manufacturer