GNS Group PCB Assembly Service

At GNS Group, we specialize in providing high-quality PCB assembly (PCBA) solutions for industries like automotive, medical, robotics, and more. Based in Shenzhen, China, we offer fast prototyping (as quick as 24 hours) and reliable mass production services. With over 2,500 trusted suppliers, we ensure top-quality components and timely delivery, backed by certifications like ISO 9001 and IATF 16949.

Hot Products & Solutions

One-stop PCBA solutions from GNS Group—fast, certified, and reliable assembly services trusted across automotive, robotics, medical, and more.

Certified Automotive-Grade PCBA with IATF 16949 Compliance
Automotive PCBA

Advanced 8-layer automotive PCBAs with IATF 16949 certification, featuring high-temperature resistance and EMC compliance for next-generation vehicles.

Industrial PCBA with Copper Core Base for High Thermal Conductivity
Industrial Control PCBA

Robust industrial control boards with copper base materials, designed for harsh environments and high-reliability applications with 24/7 operation capability.

AI-Controlled Robotic PCBA for Motion and Power Management
Robotics

High-precision PCBA for intelligent robotics systems, optimized for motion control, sensor fusion, and AI processing. GNS ensures stable signal integrity and durability in dynamic and autonomous environments.

Ultra-Compact PCBA for Consumer Electronics and Smart Devices
Consumer Electronics

Tailor-made PCBAs for smart consumer devices, including wearables, audio systems, and connected home products. Our solutions balance miniaturization, cost-efficiency, and mass production scalability.

PCB Manufacturing

With our self-owned PCB factory, we deliver 1–60 layer boards at fast lead times, supporting HDI, high-frequency, and complex multilayer designs for various applications.

Component Sourcing

45M+ SKUs and 2,500+ trusted suppliers empower our sourcing service with intelligent BOM optimization, lifecycle management, and fast, reliable delivery.

PCB Assembly

In-house SMT and THT assembly—including wave soldering—delivered with high precision, speed, and quality control.

Box Build

Complete in-house system integration with enclosure assembly, wiring, labeling, and full functional testing for turnkey delivery.

High-Quality PCB Assembly Service with Certified Standards and Full Process Traceability

Certified, traceable, and digitally controlled PCBA with strict quality, MES tracking, and IPC-compliant standards.

SMT Workshop: Fully Automated PCBA Line at GNS Group

Real-time quality control with MES, ERP, WMS

A BOM list follows a very specific BOM template that specifically lists each item required for assembly, including the component package, part number, size, volume, manufacturer name, etc.

01
ISO 13485 & IATF 16949 Certifications – GNS Group Compliance

Certifications: ISO9001, ISO13485, IATF16949

02

Upon receiving the BoM and PCB files, GNS swiftly begins component sourcing through its standardized process and AVL network, ensuring accuracy, speed, and supply chain efficiency.

Microfocus X-Ray Inspection for Hidden Solder Joint Quality

Advanced inspection equipment: 3D SPI, AOI, X-Ray, FAI

Sourcing components from multiple trusted suppliers, ensuring availability, and purchasing based on your product requirements and preferred specifications.

03
Digital MES display of SMT line ESD control and real-time production monitoring at GNS Group

Full traceability and ESD control

With GNS’s PCBA service, components are sourced from your designated suppliers or trusted partners like DigiKey, Mouser, Arrow, Avnet, Future Electronics, and Farnell.

04
GNS technician conducting visual inspection of PCB under digital microscope with 4K monitor

IPCII and IPCIII standard compliance

After sourcing components, GNS manages procurement and collection before PCB assembly. Our expert team ensures top standards in supply management and component safety.

05
GNS quality inspector reviewing PCBA layout at IPQC station with microscope and digital tools

Strict QC: IQC, IPQC and OQC

As a customer, GNS’s support team is always available to assist with order status updates or any changes you need throughout the production process.

06

Fast Delivery

Speed Without Compromise
GNS ensures rapid production with streamlined processes and in-house coordination—delivering prototypes within 24 hours.

In-House Production

Integrated PCB & PCBA factories enable synchronized workflows and faster turnaround.

High-Speed SMT Lines

33+ SMT lines with daily output of 26 million points ensure scalable, fast assembly.

On-Site Logistics

Same-location PCB, PCBA, and warehousing reduce lead time and shipping delays.

Strong Manufacturing Capability

At GNS, we offer full-spectrum PCBA solutions—from 01005 SMT to 60-layer boards, powered by world-class equipment. Our in-house capabilities include SMT, DIP, wave soldering, nitrogen reflow, conformal coating, programming, functional testing, and box build—ensuring precision, scalability, and efficiency under one roof.

Process Category Process Ability
PCBA board categoriesRigid, Rigid-Flex, FPC, Aluminum Base, Copper Base
StencilStandard Stencil, Step Stencil, Nano Stencil
Max PCB panel sizewidth 340mm, length 450mm
Min PCB panel size50*50mm
Min SMD Component Size01005
Min BGA Ball Pitch0.25mm
Min QFN Pitch0.35mm
Min QFP Pitch0.35mm
Printing ProcessSolder paste, solder paste + red glue process
SMT assemblyDouble-sided SMT assembly
QFN solderingSingle row, double row, triple row QFN soldering
Reflow oven temperatureStandard 240-250°C (low-temperature soldering supported for special devices)
AOI inspection0201 size and above
X-RAY inspectionSupport internal pin detection
Wave soldering oven temperatureStandard 255-265°C
Through-hole assemblyDouble-sided through-hole assembly
DispensingSupport
Conformal coating processSupport
ProgrammingPre-production programming, online programming
TestingCustomized test fixtures
ICTICT pin planting rate according to customer PCB design review
FCTSupport
Board separationV-CUT, stamp holes

GNS is a one-stop PCBA service manufacturer, providing PCB/Components/PCBA total solution from prototype to mass production. Our multi-layers PCB factory offers fast delivery of high quality, with all processes made in-house. The supply chain is supported by a professional and experienced team, as well as a big data digital system, offer the most competitive price and stable delivery with original quality.

Get A Free Quote

Lorem ipsum or sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

SMT Manufacturer

Get A Free Quote

Submit your form to claim an industry-defining PDF—the gift surprise awaits on the final page!

SMT Manufacturer