Frequently Asked Questions

PCBA & Components with GNS

Looking for fast-turn PCBA manufacturing and BOM component solutions in one place?

GNS delivers prototype-to-mass production services with fast response, certified quality, and full traceability. Below, we’ve answered the most common questions from our global customers to help you move forward confidently.

PCB Manufacturing FAQs

Understand the documents and files needed for quoting and how GNS handles your first order quickly and professionally.

Q1. What PCB file formats do you accept?

We accept Gerber RS-274X files (preferred), as well as Altium Designer (.PCB/DDB), Eagle (.BRD), and KiCad files. If you’re using another software, feel free to contact us for compatibility confirmation.

No. At GNS, we support both prototyping and mass production with no MOQ restrictions, enabling flexibility for startups and high-mix, low-volume projects.

You’ll receive a detailed quotation within 24 hours after submitting your Gerber and BOM files. For urgent projects, our sales team can prioritize requests upon request.

  • In-house PCB and SMT factories
  • Automated quoting and production systems
  • Over 2,500 approved component vendors
  • Engineering optimization before production

These factors help us reduce costs while maintaining quality.

GNS has 17+ years of experience in PCB fabrication and turnkey assembly. With over 500 professional staff and 33 SMT lines, we’ve completed thousands of projects globally.

  • Trace width: 3 mils
  • Spacing: 3 mils
    Our advanced etching control and AOI/ET inspection ensure precision even with fine pitch designs.

We offer a full range of solder mask colors, including:
Green, Red, Blue, Black, White, Yellow, and Matte options (subject to availability and order quantity).

  • HASL / Lead-free HASL
  • ENIG (Gold)
  • Immersion Silver / Tin
  • OSP
  • Hard Gold / Bondable Gold

Each surface finish is selected based on your project’s electrical and environmental needs.

Yes. For standard 2–6 layer PCBs, we can typically provide quotes within 4 hours. For complete PCBA projects, our sourcing team validates BOMs against 2500+ AVL suppliers for accurate cost. Lead time:

  • PCB only: ~2–6 hrs
  • PCBA with BOM: ~6–24 hrs
Q10. Do you offer impedance control and stack-up design?

Yes. GNS produces HDI boards featuring:

  • Laser microvias
  • Blind/Buried vias
  • Via-in-pad technology
    We support up to 3 sequential lamination cycles.

Yes. Multi-design panels are supported after DFM review. It’s ideal for startups testing several layouts in one production batch.

Yes, peelable solder mask is available upon request for selective wave soldering or conformal coating processes.

Yes. GNS specializes in:

  • Rigid
  • Flexible
  • Rigid-flex PCBs, supporting dynamic bend and space-saving designs.

All boards are 100% tested using:

  • Flying Probe (for low-volume)
  • Test Fixture (Bed of Nails) for mass production

Absolutely. We work with Rogers, Taconic, and other high-frequency laminates to produce RF/microwave PCBs for antennas, radar, and communication systems.

Yes. We provide MCPCBs for high-heat applications like LEDs, power supplies, and automotive lighting—up to 6 layers supported.

Yes. We offer edge connector gold plating with beveling for PCBs used in backplanes, servers, and slot-in modules.

No. Standard panelization is free of charge. Custom paneling with break-tabs or scoring can be discussed during DFM.

Q19. Can you make HDI PCBs?

Yes. GNS produces HDI boards featuring:

  • Laser microvias
  • Blind/Buried vias
  • Via-in-pad technology
    We support up to 3 sequential lamination cycles.

Yes. We support castellated holes for modules such as Wi-Fi, Bluetooth, and embedded systems.

Yes. V-cut scoring is available based on your panel design.

  • Number of layers
  • PCB size & shape
  • Material type (e.g., FR4, Rogers)
  • Surface finish
  • Impedance control
  • HDI and microvia requirements
  • Order quantity and delivery speed

Yes. We provide step milling, depth control routing, and custom slotting per Gerber and drill data.

GNS works with top-grade materials:

  • FR4 (Normal and High-TG)
  • Rogers, Arlon, Taconic
  • Polyimide
  • Ceramic
  • Aluminum base
  • Megtron series for high-speed digital designs

Yes. All our PCBs are RoHS compliant by default, and we also offer leaded finishes upon customer request.

Get A Free Quote

Lorem ipsum or sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

SMT Manufacturer

Get A Free Quote

Submit your form to claim an industry-defining PDF—the gift surprise awaits on the final page!

SMT Manufacturer